Our Geothermal Trim Kits (GTK) provide a factory assembled, complete solution for air, pressure, and dirt management. Each GTK comes with flush/purge valves, air/dirt separator, expansion tank, and supply and return headers (multi-unit only) with a choice of adapters to each heat pump, including pre-assembled flexible reinforced rubber hose kits. GTKs save 8-10 person hours of on-site assembly and fusion work allowing the contractor to concentrate on the more technical aspects of of the installation, and install the geothermal equipment more quickly.
- Supply/Return Pipe Size: 1-1/4"
- Flush Valves/Ports Included: isolated
- # of Circuits: 1
- Circuit Connection: 1-1/4" HDPE SF
- Air Separator: 1"
- Expansion Tank: 2 gallon